In case you're wondering how cleaning the basement relates to re-doing the kitchen, we have to do all our cooking and a lot more living down there while we can't use the kitchen. The kitchen work should take about a month.
This is how the main room of the basement looked just before we got started on Boxing Day (the perfect day to start, right?).
It may be hard to tell, but we had made a lot of progress by this point.
I had to take a picture of this subset of our dolls before I got rid of a few.
Kitchen Before:
This is our kitchen, ready to be renewed! We had to take everything out and move it to our basement during the renovation.
We're ready to have this problem fixed!
By Saturday night, we had everything sufficiently set up and ready to cook, eat, and enjoy. It actually turned out to look pretty cozy and welcoming.
| cake made in the rice cooker - it tasted better than it looks |
| chocolate pudding made in the electric skillet |
We love our new pantry (previously the paint room)!

We had fun decorating the kitchen before it was demolished.

Kitchen under construction:
| kitchen cabinets waiting in our living room for installation |
New tile in the hall:
We had to hop over from the front door to go upstairs.
The bathroom:
Needless to say, life has been both challenging and exciting lately. We're thankful for insurance which covers so much of the expense.
Challenging:
| Despite the above tarps to block dust, the rest of the main level is pretty dusty. |
Exciting:
Until next time...
~Posted by Joanna
















1 comment:
Thanks for all the pictures! It looks like the remodel has been quite the adventure! It's wonderful that you have the space in the basement to eat and cook in while it's being done. We may end up doing something similar someday if Mom and Dad get the floors on the main level redone.
Post a Comment